The plan
The Three-Year Interior Roadmap.
A phased path across the full life of a yacht interior, from design to refit, aligned to the Water Revolution Foundation plan. Each phase turns intent into measurable, verifiable steps.
- Roadmap phases
- 01 · Design
Specify for measurable impact
Bring smart, sustainable material choices into the earliest design decisions, where the largest share of a yacht interior's footprint is set.
- Material selection criteria
- Design-stage guidance
- Early research access
- 02 · Build
Verify what goes on board
Translate criteria into the build: documented materials, recognised certifications and technical data that can be checked rather than assumed.
- Certification alignment
- Supplier collaboration
- Verified specifications
- 03 · Operations
Sustain performance in service
Carry the standard through the operational life of the interior, so choices made at design and build keep delivering once the yacht is in use.
- In-service knowledge sharing
- Shared best practice
- Continuous learning
- 04 · Refit
Renew without resetting
Apply the same measurable approach to refit and renewal, extending the life of interiors and closing the loop on material choices.
- Refit guidance
- Material reuse
- Lifecycle thinking
- Honest by design
Targets here describe direction, not promises. Specific figures are published only once they are measured and verified, results, not intentions.
- Take part
Help shape the roadmap from the inside.
Partners contribute to the criteria, the research and the standards that define each phase.